Про проект
- Дата: 18.06.2017
- Клієнт: Legal entity
- Категорія: Commercial projects, Solar power plants
- Адреса: Ukraine, Khmelnytskyi region, Kamianets-Podilskyi district
Our team performed a set of works on the installation of a commercial ground-based grid power plant with a capacity of 1.1 MW (1st stage of construction). The purpose of the FES photovoltaic station is to operate under the "green" tariff.
The completed works on the construction of the solar station included installation and commissioning works on sections of ETR 0.4 (switching and energization of solar panels through cabinets of constant connection to inverters) and work on section ETR 10 kV. Works on the installation of the communication line, automation of the complex, lighting, video surveillance, perimeter control and own needs for the solar generating plant were also performed.