Про проект

The entire complex of works on the installation of a commercial ground network FES with a capacity of 1.2 MW has been completed (2nd stage of construction). The purpose of the FES photovoltaic station is to operate under the "green" tariff. The completed works on the construction of the solar station included installation and commissioning and adjustment works on sections of ETR 0.4 and 10 kV, automation of the complex, lighting, video surveillance, perimeter control, own needs and SCM.