Про проект

A set of works on the installation of a 4 MW commercial ground network PSS was completed. The purpose of the FES photovoltaic station is to operate under the "green" tariff. Technical parameters of the project: KRPZ for 10 kW – 1 pc., KTP-630 kW – 5 pcs. and control center. 54 network (string) inverters are installed, the nominal power of each solar inverter is 75 kW. The completed works on the construction of the solar station included installation and commissioning works on sections of ETR 0.4 and 10 kV, communication lines, automation of the complex, lighting, video surveillance, perimeter control and own needs. The connection to the networks of the terrestrial solar power plant is carried out by a separate project.