Про проект
- Дата: 10.08.2019
- Клієнт: Legal entity
- Категорія: Commercial projects, Solar power plants
- Адреса: Ukraine, Kirovohrad region, Blagovishchensky district
New project of a commercial FES with a capacity of 3 MW has been implemented. Designation of the photovoltaic station of the grid FES - work according to the "green" tariff.
The photovoltaic plant is fully equipped with a 10 kV closed switchgear and complete transformer substations. The photovoltaic station was built using network (string) inverters with a nominal capacity of 75 kW. 80 kW of solar panels are connected to each of the inverters. The entire complex of earthworks and electrical engineering works of 0.4/10 kW, including start-up and adjustment, was also performed on the automation of the complex and the connection of the generating unit to external power supply networks.