Про проект
- Дата: 21.08.2019
- Клієнт: Legal entity
- Категорія: Commercial projects, Solar power plants
- Адреса: Ukraine, Kherson region, Oleshkiv district
A complex of works on the installation of a commercial FES with a capacity of 5.1 MW was completed. Designation of the photovoltaic station of the grid FES - work according to the "green" tariff.
The photovoltaic plant is built using network (string) inverters with a nominal power of 75 kW, the total number of installed direct current network inverters (manufacturer SMA) is 68 units. The entire complex of earthworks and electrical engineering works of 0.4/10 kW for the installation of the ground-based solar power plant was completed.