Про проект
- Дата: 10.11.2017
- Клієнт: Legal entity
- Категорія: Commercial projects, Solar power plants
- Адреса: Ukraine, Kherson region, Boryslav district
Completed a set of works on the installation of a commercial ground grid FES with a capacity of 4 MW (2nd stage of construction). The purpose of the FES photovoltaic station is to operate under the "green" tariff.
The completed works on the construction of the solar station included installation and commissioning works on sections of ETR 0.4 and 10 kV, communication lines, automation of the complex, lighting, video surveillance, perimeter control and own needs.